Skip to Content
New
How digital is your business? Take the free 2-minute ERP Readiness Check.
๐Ÿ“ข Live Webinar: ERP for SMEs: join our next free session.
Process management ยท Lean Management & Six Sigma

Less waste. Fewer defects. And the proof to go with it.

Lean Management takes out of your processes whatever creates no value. Six Sigma proves with data that the improvement actually happened. "We think it runs better" turns into a number you can check.

Defect Rate: Before & After
Lean Six Sigma Green Belt Yellow Belt DMAIC
Scroll to explore
In short

What this means for your business

If the terms mean nothing to you: you do not need to know them. What they are about, you know from everyday work.

Lean

Lean asks one single question of every step in the work: does it give the customer something? Everything else is effort that somebody pays for. Duplicate approvals, waiting for replies, searching, rework, interim storage. Lean makes those places visible and clears them away.

Six Sigma

Six Sigma deals with what still goes wrong. Instead of guessing at the cause, it measures. Where do defects arise, how often, and what is actually behind them? Only then is something changed, and afterwards it is measured again.

Together

Together that means: your processes get faster and cheaper, and at the end you can prove by how much. That is exactly the difference from an improvement that feels good and is gone again after three months.

Two disciplines, one goal

Lean removes the waste. Six Sigma proves the result.

They come from different traditions and together they cover both sides of process improvement: doing less of what achieves nothing, and knowing for certain what works.

Lean Management

Leaving out what creates no value

Lean began in manufacturing at Toyota with one question: does this step help the customer? Whatever does not is challenged. Applied properly, it makes processes faster and cheaper without cutting corners on quality.

  • The eight kinds of wasteOverproduction, waiting time, transport, over-processing, inventory, unnecessary movement, defects and unused employee potential. Systematically recorded and removed.
  • Value stream mappingA clear picture of how the work actually flows, so it becomes visible where it stalls.
  • 5SSort, set in order, shine, standardize, sustain. A method that keeps physical and digital workplaces in order for good.
  • KaizenContinuous improvement in small steps, built into the daily work rather than run as a project that peters out after six months.
Six Sigma

Reducing variation, proving the effect

Six Sigma treats quality as a measurement problem. Instead of assuming a process works, it establishes statistically where defects and variation come from. What gets fixed is the cause, not the symptom.

  • Data instead of opinionEvery decision rests on measurements from the real process, not on assumptions about how it ought to run.
  • Root cause analysisStatistical tools trace a defect back to its actual source, so that the fix holds.
  • The belt systemThe training levels from Yellow through Green to Black Belt build statistical rigour into problem solving and make competence comparable.
  • Built-in controlOnce a process is in order, ongoing monitoring makes sure it does not quietly slip back.
Why it is worth it

What it costs to work without Lean and Six Sigma

Hardly any business deliberately chooses erratic, laborious processes. It happens step by step, one stopgap after another, until nobody can say any more why a case takes so long.

Without Lean and Six Sigma

  • โœ•Improvements based on gut feel rather than measured data
  • โœ•The same defect resurfacing every few months
  • โœ•Nobody can say exactly where the waste is hiding
  • โœ•A fix that lasts a week, then quietly slips back
  • โœ•Decisions defended with opinion, not evidence

With Lean and Six Sigma

  • โœ“Every improvement backed by real process data
  • โœ“Root causes removed, not symptoms papered over
  • โœ“A value stream map showing exactly where work stalls
  • โœ“Control plans that keep an improvement from drifting back
  • โœ“Decisions your team can actually defend with numbers
What changes in practice

What Lean and Six Sigma actually deliver

Not a redrawn flow chart, but a measurable change in how the work moves through your business.

Fewer defects

The analysis finds the cause rather than the symptom. That is why a problem once fixed stays fixed and does not reappear next quarter.

Less waste

Every process step justifies its place or goes. What remains gives the customer something.

Shorter cycle times

Without waiting time and detours an order runs through faster, and deadlines become plannable instead of tight.

Consistent quality

The result depends less on who happens to take the task on and how much experience that person brings.

More capacity without more staff

When rework and searching fall away, working time is freed up that nobody previously counted as a cost.

Improvement that lasts

Kaizen and control plans anchor the new standard in everyday work, instead of leaving it to depend on the attention of individuals.

How we go about it

DMAIC, the five phases

The structured approach behind every Six Sigma project we run.

D

Define

Set out the problem, the customer requirement and the target state, and do it in numbers.

M

Measure

Record how the process actually runs today. Where system data exists we evaluate it with process mining, instead of measuring by hand for months.

A

Analyze

Find the real cause of defects and variation, statistically rather than by guesswork.

I

Improve

Design changes that address the cause, and check whether they work.

C

Control

Set up monitoring so the improvement holds and does not disappear after three months.

The Measure phase decides the whole project and is at the same time the most expensive one. How to judge whether a company's data is good enough for a data-based analysis at all is the subject of one of our publications.

The Six Sigma scale

What a sigma level actually means

Six Sigma takes its name from a statistical scale. Each step up means roughly a tenth as many defects.

2ฯƒ
308.537
3ฯƒ
66.807
4ฯƒ
6.210
5ฯƒ
233
6ฯƒ
3,4
Sigma levelDefects per million opportunities (DPMO)What that means in practice
2ฯƒaround 308,537Roughly every third case is defective
3ฯƒaround 66,807About every 15th case, typical of a process that is not under control
4ฯƒaround 6,210About every 160th case, a solid, well-run process
5ฯƒaround 233About every 4,300th case, leading in the industry
6ฯƒaround 3.4About every 300,000th case, virtually defect-free

The jump from one level to the next is easiest to achieve at the start and has the strongest effect there. Where your process stands today is what the Measure phase shows.

Your contact

The person behind your improvement projects

Every DMAIC project with us is led by Andreas Erhard. He records the processes himself, evaluates the data himself and stands in the workshop himself.

Andreas Erhard

Andreas Erhard, BA, MSc, MBA

Managing director and process manager

Lean Six Sigma Green Belt Yellow Belt

Over his career he has recorded, documented and assessed more than 1,500 processes. The Green Belt runs improvement projects to DMAIC independently and works with the statistical tools behind it.

Publications
Erhard, A., Arthofer, K., Helm, E. (2023): Extending a Data Management Maturity Model for Process Mining in Healthcare. In: dHealth 2023, Studies in Health Technology and Informatics, IOS Press. doi.org/10.3233/SHTI230038
Pointner, A., Krauss, O., Erhard, A., Schuler, A., Helm, E. (2023): Multi-Perspective Process Mining Interfaces for HL7 AuditEvent Repositories: XES and OCEL. In: dHealth 2023, Studies in Health Technology and Informatics, IOS Press. doi.org/10.3233/SHTI230034
Implementation

And when the improvement needs automation

Many of the controls and evaluations that come out of a DMAIC project cannot be kept up on paper for long. We build them straight into your Odoo system instead of putting another tool next to it. The metric you want to watch in the Control phase then arises exactly where the work is booked anyway.

Frequently asked

What we are asked almost every time

No. We work with the people who are responsible for the process anyway. If the capability is meant to stay in the house permanently, we work with one of them closely enough that they can lead the next project themselves.
That depends on the scope. Two things matter above all: how much data has to be gathered in the Measure phase, and how many influencing factors the analysis has to check. We clarify both in the intro call, and then give you a timeline you can rely on for your specific case.
Yes, directly on the project. We work through the methodology together with your people on your own process, so the capability stays in the house. If you also want a formal certification with an examination, we recommend an accredited provider for that. The one complements the other.
Yes, and closely. Where an improvement needs automation or a new control, we build it into your existing system rather than into a separate tool alongside it.
Usually the Control phase gets skipped. Then the improvement quietly slips back as soon as attention moves on. We build the monitoring into the process itself, not into a slide deck that gets filed away.
Every project defines up front which metric it is meant to improve, and measures the baseline with your own process data. The comparison afterwards runs against that baseline and is not estimated after the fact.
โœ“ Free, no-obligation intro call

The way in is the process analysis

Lean and Six Sigma are the methodology. They are applied in a project, and that starts with us looking at how your processes run today. In the intro call we work out in 30 minutes whether it is worth it for you.

Or go direct: Andreas Erhard, +43 732 237227-102

More on the process analysis โ†’